What is PPAP?

A PPAP (Production Part Approval Process) checklist is a tool used by quality managers to ensure full approval for the production and shipment of parts in the automotive and other manufacturing industries. It helps identify inconsistencies across process flows, FMEAs, and control plans, while also ensuring the complete, accurate, and timely submission of required PPAP documents—such as Design Records, Appearance Approval Reports (AAR), and Initial Sample Inspection Reports (ISIR).

Importance

PPAP is an 18-step guideline for Original Equipment Manufacturers (OEMs) and suppliers. PPAP documents show that OEMs and suppliers understand customer specifications and ensure that their manufacturing process consistently produces conforming parts at the quoted production rate. Customers examine the PPAP documents and determine the production part approval process status—fully approved, interim approval, or rejected.

What are the Elements of a PPAP Checklist?

There are currently 18 requirements and documents as part of PPAP. These elements should be included in the PPAP checklist as listed below:

  1. Design records

  2. Authorized Engineering Change Documents

  3. Customer Engineering Approval

  4. Design FMEA

  5. Process Flow Diagram Assessment

  6. Process FMEA

  7. Control Plan

  8. Measurement System Analysis

  9. Dimensional Results

  10. Records of Material / Performance Test Results

  11. Initial Process Studies

  12. Qualified Laboratory Documentation

  13. Appearance Approval Report

  14. Sample Production Parts

  15. Master Sample

  16. Checking Aids

  17. Customer Specific Requirements

  18. Part Submission Warrant

3 Common PPAP Mistakes and How to Avoid Them

Due to the methodical and comprehensive nature of the production part approval process, quality managers often overlook some customer-specific requirements. When PPAPs get rejected, OEMs and suppliers inevitably waste time and resources on implementing corrections for resubmission. Here are 3 common mistakes during the PPAP and how to avoid them:

3 Common PPAP Mistakes

1. Ineffective Communication Between Supplier and Customer

Quality managers should work closely with the PPAP evaluator to provide exactly what the customers are looking for, especially when there are engineering changes and the master sample needs sign-off from both parties. During the contract review, clarify customer specifications with FMEA teams, design engineers, and manufacturing personnel to facilitate effective communication in the manufacturing facility as well.

2. Mismatched Process Flows, FMEAs, and Control Plans

There should be a clear link from the Design FMEA and Process FMEA to the Process Flow Diagram and Control Plans. Quality managers should consider all known special characteristics and address all high-risk failure modes with executable action plans to accurately demonstrate all manufacturing operations, handling techniques, inspection steps, and alternate/backup processes. Detailed and complete process control plans should be in place and include all print, specification, attribute, and purchase order requirements.

3. Mismanaged PPAP Documents

Most PPAP revisions get rejected because of avoidable clerical shortcomings. Quality managers should provide evidence that the FMEA is a living document, a special characteristics deviation waiver is available, and non-conformance in any of the PPAP documents is resolved before submission. All PPAP documents should be legible, updated, and reviewed for completeness.

PPAP Status and What to Do Next

The PPAP evaluator may take some time reviewing the PPAP documents, but quality managers can use the lead time to create fixtures and adjust a few operating parameters. Upon receipt of the PPAP status, here is what OEMs or suppliers should do to move forward:

Fully Approved

Since the part and its PPAP documents have proven that the manufacturing process can consistently produce conforming output, the parts can now be shipped to the customer as scheduled. OEMs and suppliers prevent costly production delays when they meet or even exceed customer expectations.

Interim Approval

If customers see nonconformance in any of the PPAP documents, containment measures should be undertaken by the quality manager. Even when the OEM or supplier is authorized to ship for a defined period of time and/or a limited number of parts only, corrective actions should be implemented and reflected in the resubmission of PPAP documents to gain full approval within 90 days.

Rejected

When the part fails to meet customer-specific requirements or when the PPAP shows inconsistencies in the documentation, the OEM or supplier is not authorized to ship the rejected product. Quality managers should execute corrective actions based on what the customer established as the reason for rejection, and revise PPAP documents accordingly before resubmission.

PPAP Checklist Sample Report

To give an idea of what an accomplished report looks like, here’s an example of a PPAP report in PDF format:

PPAP Checklist Sample PDF Report

PPAP Checklist Sample PDF Report

This is a CTA image

Still looking for a checklist?

Create a custom checklist template instantly with AI

JT

Article by

Jona Tarlengco

SafetyCulture Content Specialist

View author profile

Related resources you might like

Powered by

PPAP Documents Checklist

A PPAP documents checklist aims to ensure the accurate and timely submission of production part approval process documents. This PPAP documents checklist contains a PPAP submission assessment for quality managers to evaluate their performance of the PPAP and maximize opportunities for continuous improvement. Easily complete PPAP documents such as measurable system analysis studies, performance and material test results, and checking aids with the use of this checklist.

Powered by

FMEA Template

Manufacturing engineers can use this FMEA template to help prevent production issues caused by industrial machinery failures. Observe trends of failure modes, effects, and causes. All SafetyCulture (iAuditor) templates can be customized to fit the needs of your business.

Powered by

Appearance Approval Report Form

An Appearance Approval Report Form aims to document the color evaluation of an appearance item identified on the engineering drawing. This appearance approval report form has been designed to make it easier for quality engineers to specify the reason for submission, sourcing and texture information. Use this appearance approval report form to take or attach relevant photos of an appearance item and evaluate hue, value, chroma, gloss, and metallic brilliance.

Powered by

Initial Sample Inspection Report Form

An Initial Sample Inspection Report Form is prepared and completed by quality inspectors prior to sending sample production parts to the customer for approval. Start by indicating the part name and number, order quantity, and delivery quantity. Identify the scope and extent of the inspection and indicate inspection results as released, released with stipulations or rejected. Finally, capture the digital signature of the customer representative as an agreement to the overall disposition of the intial sample inspection report.

Articles

Water Quality Software

Discover the most outstanding water quality software and deliver clean and potable water to the community you serve with your top pick.

Corrective Action: Plan, Examples, and Process

Learn about corrective action with examples, how to create a plan, and demonstrate a conforming corrective action process.

Construction Quality Control Checklist

Ensure compliance with regulatory standards and specifications by using construction quality control checklists.